Showing posts with label link. Show all posts
Showing posts with label link. Show all posts

Saturday, February 20, 2010

DPM 2010 the story so far..

On the technet DPM team blog Prashant Kumar (Program Manager | DPM Team) wrote a post with a lot of interesting background information on DPM 2010.
He describes how some of the new features in DPM 2010 help you to meet you business SLA’s.

  • Automatic rerun of failed jobs;
  • Automatic consistency checks;
  • Automatic grow of DPM volumes;
  • Automatic discovery of SharePoint and SQL databases;
  • SLA reports.

Post can be found here